Find out why a job did not run

Ask Blowhorn why one scheduled activity ran or not, in one read-only command.

One command names the reason an activity has or has not run on this computer, in the order the scheduler itself decides it, and ends in one plain sentence:

terminal
blowhorn schedule why 7
output
activity 7 · post · your-profile · linkedin

  enabled        yes
  valid          yes
  paused         no - activity not held, studio not paused, all-machines not paused
  due            yes - next_run_at 2026-08-31 06:00:00, 14 min ago
  claimed        yes - laptop:9912 since 2026-08-31 06:02:10, lease expires 2026-08-31 06:32:10
  this machine   studio · store reachable · last pass 2026-08-31 06:14:02 (2 min ago)
  last run       2026-08-30 06:03:11 on laptop · ok · 12 attempted, 12 confirmed

studio did not run activity 7 because laptop:9912 claimed it at 2026-08-31 06:02:10 and still holds the lease (expires 2026-08-31 06:32:10).

Read it top to bottom: enabled, valid, paused (naming the scope and how to lift it), due, claimed, this computer, last run. The closing sentence is the answer; quote it in a bug report with --json for the same answer scripts can read.

What the common answers mean

  • Paused. The scope is named: the activity, this computer, or all computers. Lift it with blowhorn schedule resume, with --all or --activity 7 to match.
  • Claimed by another computer. A claim is a lease, not a lock: the holder renews it while the job runs, and a dead computer stops renewing, so its activities return to the pool when the lease lapses. schedule list names every holder in its Locked By column; your own claims read (this machine). Another macOS user's claims on the same Mac do not: they share the computer's name, not your install.
  • Not due. Next Run At has not passed yet. The service wakes for it when it comes; schedule status says whether the service is still passing over the schedule on this computer.
  • Gave up. The last run used the activity's final retry, so it is failed with no next time. For a repeating activity the whole series has stopped - deliberately: repeated failures usually mean a broken sign-in or a platform checkpoint, and retrying on the recurrence risks the account. Give the activity a new time to restart it (the series, if it repeats) with a fresh set of retries.
  • Invalid. blowhorn schedule validate names what the activity breaks.
  • Out of date. schedule status names the cause app_outdated: the server's minimum app version is newer than this build, so the pass claims nothing and every activity stays due. Update Blowhorn (Update Blowhorn) and the next pass claims again; nothing is lost, because due activities are not consumed by a pass that refuses to claim.

The command is read-only: it claims nothing, runs nothing and changes nothing, so it is safe against an activity that is mid-flight.

Free tool

Am I a Bot?

See what sites can read about your Chrome profile.

Support

Stuck on something?

Email us and a person on the team will help.